SarthiROBOTICS
In Development

This is what you are buying

Not the robot: the document it writes. Below is the report structure the intelligence layer produces, rendered with clearly labeled synthetic values. As the Report v0 pipeline processes our recorded field data, this page will carry real output.

Illustrative sample data. Structure mirrors the production report; values are synthetic.

Inspection report

Sarthi Robotics · 2026-03-12

Delivered 05:41, 19 min after the robot reached comms

Mission
SR-2026-0312
Type
M2 Routine patrol with change detection
Site
Underground test gallery, northern Sweden
Level
Level 2, drift A-C loop
Date
2026-03-12
Started
04:10
Reached comms
05:22
Report delivered
05:41
Duration
72 min
Distance
2.1 km
Coverage
96%
Compared against
2026-03-10

Summary

Scheduled patrol completed without intervention. 96% of the planned route covered; one segment skipped due to standing water at chainage 1+640. Three findings flagged, one classified as new since the previous run. Gas levels nominal throughout. Recommend maintenance review of finding F-02 before the next blast cycle.

Route coverage

04:1004:1904:2704:3604:4704:5605:0305:1005:18skipped: standing water

Environment readings

CO

4 ppm

range 0-9 ppm

NO2

0.3 ppm

range 0.1-0.6 ppm

O2

20.7 %

range 20.5-20.9 %

Temp

11.2 C

range 9.8-13.1 C

Humidity

78 %

range 71-84 %

Airflow

1.9 m/s

range 1.2-2.3 m/s

Findings (3)

  • F-01attentionNew since last run

    New debris on floor, chainage 0+940

    Change detection against the 2026-03-10 run shows a debris accumulation of roughly 0.4 m height on the drift floor near the ore-pass junction. Not present in the previous scan.

    Drift B, chainage 0+940

  • F-02attention

    Mesh deformation progressing, wall section W-14

    Bulge in the wall mesh measured 60 mm deeper than the previous run and 110 mm deeper than the baseline scan from 2026-02-24. Trend is consistent across three runs.

    Drift A, section W-14

  • F-03watch

    Water ingress unchanged, chainage 1+640

    Standing water on the planned route, extent unchanged within measurement tolerance. Route segment skipped per mission policy; drainage state photographed.

    Drift C, chainage 1+640

Change detection · 2026-03-12 vs 2026-03-10

Two geometric changes above threshold: debris accumulation at 0+940 (new) and mesh deformation at W-14 (progressing). All other sections within tolerance.

The change-detection view

Finding F-02 from the report above, as the engineer sees it: two registered scans of the same wall section, two runs apart. The saffron points are the deformation.

Registered cross-section · W-14Illustrative data
Baseline 02-24
Current 03-12
<>
Because the robot repeats the same trajectory every run, scans register cleanly: the saffron points are what changed. Drag to compare.

Want this for your site?

Tell us what your current rounds cover and we will show you what the same rounds look like as a morning report.