M2In Development
Routine patrol with deviation monitoring
A scheduled drift and infrastructure round: ground support, water ingress, services, and what changed since the last run.
Status, honestly: The base MVP mission. Repeatable patrol routes are field-proven; the longitudinal deviation-intelligence layer is in build.
Why this pays for itself
Early detection of ground movement and service degradation, with a documented compliance trail for regulators, without sending people on foot through kilometers of drifts.
What the report covers
- Mesh, bolt, and shotcrete condition with change flags
- Water ingress and pipe, vent, and cable condition
- Electrical-room thermal and gauge readings
See what lands in the inbox on the morning report page.